Annual Pipeline Modernization Plan

As part of our commitment to delivering safe and reliable service, we’re partnering with our parent company, Avangrid, to modernize the natural gas system across our service areas. This work is part of our Annual Pipeline Modernization Plan, which aligns with the latest reliability standards Distribution Integrity Management Program (DIMP) under US DOT-PHMSA regulation. 

Active projects in our service area:

French St Group Project

Project Duration: Summer 2025 - Summer 2026
Contractor: Burns Construction
Location: Bridgeport, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.
 

Impacted Streets Impacted Addresses
Whitney Pl #59-#61
Whitney Ave #81-#284
Wells St #189-#489
Parrott Ave #93-#339
Main St #2298-#2523
Gem Ave #37-#158
French St #123-#245
Charles St #74-#116
Capitol Ave #340-#522

Garfield Ave Group Project

Project Duration: Fall 2025 - Fall 2026
Contractor: Burns Construction
Location: Bridgeport, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Windsor St #27-#85
Taft Ave #25-#101
Morgan Ave #22-#120
Madison Ave #533-#1050
Garfield Ave #399-#607
Fairmont Ave #54-#114
Beers St #32-#204
Alice St #50-#247

Glendale Ave Group

Project Duration: Fall 2025 - Fall 2026
Contractor: Burns Construction
Location: Bridgeport, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Glendale Ave #34-#189
Main St #3921-#3969

Pond St Group Project

Project Duration: Summer 2025 - Spring 2026
Contractor: CB Utility
Location: Bridgeport, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Chamberlain Ave #35-#410
Chamberlain Pl #57-#127
CHOPSEY HILL RD #287-#385
FAIRVIEW AVE EXT #7-#126
FRANCES ST #32
INDIAN AVE #41-#400
POND ST #21-#230
SUMMIT AVE #30-#100

Iranistan Ave Group Project

Project Duration: Winter 2026 - Spring 2026
Contractor: NPL
Location: Bridgeport, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Iranistan Ave #1647-1690
Beechwood Ave #36
North Ave #1835-#1809

Gregory St Group Project

Project Duration: Winter 2026 - Summer 2026
Contractor: Burns Construction
Location: Bridgeport, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Atlantic St #99-#300
Broad St #390
Cottage Pl #3-#39
Ferry Access Rd #1
Gregory St #12
Kiefer St N/a
Lafayette St #60-#531
Main St #181-#418
Myrtle Ave #250-#286
Railroad CT #45
Warren Ct #1-#12
Whiting St #77-#93

Sedgewick Ave Group - Sewer Conflict Project

Project Duration: Winter 2026 - Spring 2026
Contractor: NPL
Location: Bridgeport, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Sedgewick Ave #25-#89
Tom Thumb #16-#96
North Ave #1026

Jamaica Ct Group Phase II (Mansfield) Project

Project Duration: Fall 2025 - Spring 2026
Contractor: CB Utility
Location: East Haven, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Mansfield Grove Annex #2-#73
Mansfield Grove Rd #42-#62

French Ave Group Project

Project Duration: Spring 2026-Fall 2026
Contractor: TBD
Location: East Haven, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Carlson PL #11-#18
Frank St #65-#124
French Ave #4-#140
Hotchkiss Rd #93
Iver Ave #14-#65
Thompson Ave #406

Nichols Ave Group Project

Project Duration: Summer 2025 - Summer 2026
Contractor: Burns Construction
Location: Fairfield, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Sherman St West #53-#67
Sherman St #23-#245
Sherman Ct #2-#152
Ruane St #41-#305
Nichols St #50-#249
Hurd st #18-#79
Catherine Street #6-#78
Blaine St #24-#84

French St Group Project

Project Duration: Spring 2026 - Fall 2026
Contractor: Burns Construction
Location: Fairfield, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
S Pine Creek Rd #1375-#1410
Pine Creek Ave #26-#485
French St #25-#118

Valley Rd Group Project

Project Duration: Winter 2026 - Summer 2026
Contractor: Burns Construction
Location: Fairfield, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Woodbine Ln #39-#277
Wilson St  #687-#994
Valley Rd  #687-#994
Valley Ln  #1-#51
Random Rd  #69-#386
Harwich Rd #10-#146
Farmington Ave #177-#239
Lu Manor Rd #32-#110
Chatham Rd #16 & #220
Chapel Hill Dr  #5-#111

Berkeley Terrace Group Project

Project Duration: Spring 2026 - Fall 2026
Contractor: CB Utility
Location: Milford, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets: Impacted Addresses
Crescent Dr #64-#126
Baldwin St #5-#27
Berkeley Terrace #14-#93
Eastern Pkwy #96-#188
Edgemont Dr #4-#259
Granville Ave TBD
Grove Cir #7-#47
Housatonic Dr #186
Lenox Ave #92-#127
Naugatuck Ave TBD
Regent Terrace #9-#96
Rivercliff Dr #65-142
S Woodland Dr #66-#123

Melba St Group Project

Project Duration: Summer 2025 - Spring 2026
Contractor: CB Utility
Location: Milford, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets: Impacted Addresses
Beachland Ave #27-#85
Melba St #5-#180
Mills Ave #2-#47
Pelham St #49-#81
Springdale St #1-#117
Vine St #5-#44

Miller St Group Project

Project Duration: Spring 2025 - Spring 2026
Contractor: Burns Construction
Location: Milford, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Sunset Ave  13-97
Sumner Ave  22-48
Sampson Ave  9-39
Oregon Ave N 52-222
Oregon Ave S 4-46
Nells Rd 12-45
Miller Ave  5-93
Milford Point Rd  477-650
Kay Ave  17-79
Hobson Ave  16-55
Elizabeth St 14-32
Dewey Ave  15-108
Bray Ave  5-115

Knobb Hill Upgrade Project

Project Duration: Spring 2026
Contractor: NPL
Location: Bridgeport, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Knobb Hill Rd #115-#128

Ranch Rd/Indian Hill/Knobb Hill Rd Upgrade Project

Project Duration: Spring 2026
Contractor: NPL
Location: Milford, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Ranch Rd #3-#76
Indian Hill Rd #14-#75
Knobb Hill Rd #4-#30
Old Field Ln #75-#85

Spindrift Ln Group Project

Project Duration: Spring 2026 - Fall 2026
Contractor: CB Utility
Location: Milford, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets: Impacted Addresses
Ard Ct #2-#24
Bertrose Ave #1#126
Brookdale Ave TBD
Devonshire Rd #84
Elizabeth St TBD
Lee Ct #1-#11
Morningmist Rd #3-#108
Old Elm Close #37-#68
Old Point Rd #147-#226
Sampson Ave  TBD
Sea Flower Rd #3-#196
Spindrift Ln #6-#70
Tudor Rd #1
Windsong Ln #3-#69

Hazel St Group Project

Project Duration: Spring 2026 - Summer 2026
Contractor: NPL
Location: New Haven, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets: Impacted Addresses
Dixwell Ave #591-#660
Hazel St #170-#192
Ivy St #185-#207
Sherman Pkwy #710-#715
West Hazel St #238-#276

Townsend St Group Project

Project Duration: Spring 2026 - Summer 2026
Contractor: NPL
Location: New Haven, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

 

Impacted Streets Impacted Addresses
Charles St #26
Dixwell Ave #284-#290
Henry St #31-#163
Orchard St #738-#746
Townsend St #19-#44

View St Group Project

Project Duration: Summer 2025 - Spring 2026
Contractor: NPL
Location: New Haven, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Cedar Hill Ave #112-#181
Grace St #6-#64
May St #3-#26
Ridge St #2-#76
Rock St #12-#90
State St #1346-#1400
View Street #208-#307
Warren PL #29-#78

Thorpe St Group Project

Project Duration: Summer 2026 - Fall 2026
Contractor: TBD
Location: North Haven, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Thorpe St #20-#45
Franklin St #17-#21
Washington Ave #84-#90
Woodside Dr #1-#17
Lynette Dr #1-#15

Trumbull Pl Group Project

Project Duration: Summer 2026 - Fall 2026
Contractor: TBD
Location: North Haven, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Trumbull PL #1-#25
Saint John St #1-#44

Henry Ave Group Project

Project Duration: Spring 2026 - Summer 2026
Contractor: CB Utility
Location: Stratford, CT

 

RESTORATION OF LAWN/ASPHALT/CONCRETE WILL TYPICALLY TAKE PLACE WITHIN 60 DAYS FROM COMPLETION OF THE NEIGHBORHOOD PROJECT, WEATHER-PERMITTING. For projects occurring during the fall & winter months, property restoration will be postponed until the spring. Please refer to the FAQ section on this website and your postcard for more details.

 

Impacted Streets Impacted Addresses
Canaan Rd #490
Henry Ave #15-#429

Frequently Asked Questions

Aging infrastructure and more stringent safety standards have highlighted the need to upgrade gas mains within SCG’s service territory. This program will replace leak prone gas pipes in various locations throughout our service area, across Fairfield and New Haven counties.

These projects will improve the overall resiliency of the entire system while simultaneously modernizing the pipeline components. The Annual Pipeline Modernization Plan will enhance reliability, address system repairs, and ensure performance for our valued customers.

The replacements will improve the safety and reliability of the distribution system due to more stringent safety standards in effect as compared to those when the system was initially installed. Increased reliability will be produced as the potential for gas leaks and inefficiencies are minimized. There are no noticeable above grade changes or impacts to the construction area, and the new gas system will safely provide exceptional service to the community for many years.

  • To ensure safety, before work begins, SCG and other utilities will mark water, natural gas and other underground lines in the work area, possibly on or near your property. Please do not disturb these markings.
  • During the first phase of the project, a contractor working on behalf of SCG, will install new natural gas mains. In most cases, this will mean temporary inconveniences, but we will work to ensure that you will have ready access to your driveway or parking lot. All the excavated areas will be backfilled as quickly as possible, most on the same day they are excavated.
  • The next phase of the project will include putting the new mains in service and installing new natural gas services lines from the mains to homes and businesses. Again, excavated areas will be backfilled as quickly as possible and we will do our best to minimize inconveniences.
  • For your safety and the safety of our crews, the service replacement part of this project will require that our contractor enter your home or business at a time agreeable to you to shut off the natural gas service for approximately 1 to 3 hours.

 For our Annual Pipeline Modernization Plan, SCG has contracted with the following companies:

  • CB Utility
  • Burns Construction 
  • NPL

*Contractors will be assigned to a project as we approach the project start date.*
 

 If our natural gas meter is located inside your home or business, we will move it outside. Relocation of the meter to an outside location near its present location will be done at no cost to you. Our contractor will discuss this with you.

If any asphalt or concrete is affected, it will be repaired as needed. Please note that if natural gas service work occurs during the winter, permanent restoration will be scheduled for the spring, as soon as weather conditions allow.

Lawn, asphalt, and concrete restoration typically takes place within 60 days of the neighborhood project’s completion; weather permitting. For projects completed in the fall or winter, restoration will be postponed until spring.

The service replacement part of this project will require that our contractor enter your home or business at a time agreeable to you to shut off the natural gas service for approximately 1 to 3 hours. When the work is complete, our contractor will relight appliance pilot lights and ensure that everything is working properly.

All costs for system upgrades are reviewed and approved by the Public Utilities Regulatory Authority (PURA), which operates under the Connecticut Department of Energy and Environmental Protection. These costs are ultimately shared among all ratepayers in the state, depending on the nature of the upgrade and PURA’s cost allocation policies.

You can direct any questions or concerns you may have about the Annual Pipeline Modernization Plan to:


Project Information Line: 888-309-3773 
Email: outreach@uinet.com 

A member of the Project Outreach team will get back to you within three business days. Please be sure to reference the Annual Pipeline Modernization Plan with your inquiry.